A Critical Investigation of Digging Time Segment of Draglines in a Large Surface Mine

Mousa Mohammadi , Piyush Rai , S. Kazem Oraee
Geotechnical and Geological Engineering 33 ( 4) 763 -771

2
2015
Economic Comparison of Drilling Systems in Sublevel Stoping Method

Kazem Oraee , Amir Houssain Bangian
Sixteenth international symposium on mine planning and equipment selection (MPES 2007) 688 -700

1
2007
Use of Solution Strategy in Open Cast Mining Truck Dispatching System

Kazem Oraee , Bahareh Asi
Fifteenth international symposium on mine planning and equipment selection (MPES 2006)

1
2006
Optimization of Chain Pillars Design in Longwall Mining Method

Kazem Oraee , Mehran Gholinejad , Navid Hosseini
29th International Conference on Ground Control in Mining

1
2010
TBM performance prediction in Iran

Kazem Oraee , Bahram Salehi , Arbie Sarkissian
Tunnels and Tunnelling International 51 -54

2010
Determining the amplitude of certainty for empirical rock failure criteria

Kazem Oraee , Mehran Gholinejad , Navid Hosseini
2012 SME Annual Meeting & Exhibit 2012 (SME 2012): From Mine to Market, Now It's Global 141 -145

2012
Hoisting Equipment Cost Estimation in Underground Mines

Ahmad Reza Sayadi , Mehdi Yavari , Ali Lashgari , Kazem Oraee
SME International Conference on Hoisting and Haulage 193 -200

1
2010
ANALYSES OF TUNNEL STABILITY UNDER DYNAMIC LOADS

Kazem Oraee , Mehran Gholinejad , Behdeen Oraee , Navid Hosseini
2011 SME Annual Meeting & Exhibit and CMA 113th National Western Mining Conference "Shaping a Strong Future Through Mining" 781 -784

2011
Assessment of maximum stress for improving safety in winder rope by mathematical model

Kazem Oraee , Bahareh Asi
Seventh congress on safety, health and environment in mining and related industries 32 -42

2007
Productivity in Industry

Kazem Oraee
Amirkabir University 1 -61

2
2009
Assessment of parameters influence the extraction method selection for the dimension stone quarries

Kazem Oraee , Jafar Abdollahisharif , Ehsan Lotfi , Ezzeddin Bakhtavar
SME Annual Meeting: Mine to Market, Now it's Global 244 -248

1
2012
A Model for Determining Optimal Transition Depth over from Open-Pit to Underground Mining

Kazem Oraee , Kourosh Shahriar , Ezzeddin Bakhtavar
5th International Conference & Exhibition on Mass Mining, MassMin 2008 393 -400

21
2008
Unique Push Back Exercises, Practiced at Iron Ore Company of Canada to Optimize Humphrey Pit Designs

Ali Chamanara , David R G Mitchell , Kazem Oraee
18th International Symposium on Mine Planning and Equipment Selection (MPES 2009) 216 -226

2009
The Efficiency Rate of TBM Machine

Kazem Oraee , Houssain Salehzadeh , Bahram Salehi
Civilica

2008
Effective Factors Investigation in Choice Between Surface and Underground Mining

Kazem Oraee , Kourosh Shahriar , Ezzeddin Bakhtavar
VII-th International Scientific Conference, SGEM 2007

2
2007
3D strain softening modelling of coal pillars in a deep longwall mine

Kazem Oraee , Mehran Gholinejad , Navid Hosseini
Seventeenth international symposium on mine planning and equipment section (MPES 2008)

5
2008
Economic Analysis of the Copper Mining Industry of Iran

Nikzad Oraee-Mirzamani , Kazem Oraee , Arash Goodarzi
2011 SME Annual Meeting & Exhibit and CMA 113th National Western Mining Conference "Shaping a Strong Future Through Mining" 132 -138

2011
Evaluating Underground Mining Hazards by Fuzzy FMEA

Kazem Oraee , Mohammad Houssain Basiri , Abdolreza Yazdani-Chamzini
2011 SME Annual Meeting & Exhibit and CMA 113th National Western Mining Conference "Shaping a Strong Future Through Mining" 255 -259

3
2011
Financial evaluation of Sungun Copper Project using DCF method

Kazem Oraee , Farshad Rashidinejad , Bahareh Asi
Sixteenth international symposium on mine planning and equipment selection (MPES 2007) 713 -720

2007