Time and Cost Performance of Design–Build Projects

作者: Qing Chen , Zhigang Jin , Bo Xia , Peng Wu , Martin Skitmore

DOI: 10.1061/(ASCE)CO.1943-7862.0001056

关键词: Project typeValue (economics)Transport engineeringEngineeringDesign–buildCompletion rateOperations managementProcurementCost overrunBest valueCost performance

摘要: AbstractThe design–build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support only terms of overall results, with few attempts being made relate project characteristics performance levels. This paper provides a larger more finely grained analysis set 418 DB projects from online database Design–Build Institute America (DBIA), time-overrun rate (TOR), early start (ESR), completion (ECR), overrun (COR) associated type (e.g., commercial/institutional buildings civil infrastructure projects), owners (e.g., Department Defense private corporations), procurement methods (e.g., best value discussion qualifications-based selection), contract (e.g., lump sum GMP) LEED levels (e.g., gold silver). The results show best be th...

参考文章(26)
Bo Xia, Albert Chan, Review of the design-build market in the People's Republic of China Journal of Construction Procurement. ,vol. 14, pp. 108- 117 ,(2008)
Jeffrey L. Beard, Edward C. Wundram, Michael C. Loulakis, Design-Build: Planning Through Development ,(2000)
Anthony D. Songer, Keith R. Molenaar, PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD Journal of Construction Engineering and Management-asce. ,vol. 123, pp. 34- 40 ,(1997) , 10.1061/(ASCE)0733-9364(1997)123:1(34)
Mark Konchar, Victor Sanvido, Comparison of U.S. Project Delivery Systems Journal of Construction Engineering and Management-asce. ,vol. 124, pp. 435- 444 ,(1998) , 10.1061/(ASCE)0733-9364(1998)124:6(435)
Sadi A. Assaf, Sadiq Al-Hejji, Causes of delay in large construction projects International Journal of Project Management. ,vol. 24, pp. 349- 357 ,(2006) , 10.1016/J.IJPROMAN.2005.11.010
Douglas D. Gransberg, Sanjaya P. Senadheera, Design-Build Contract Award Methods for Transportation Projects Journal of Transportation Engineering-asce. ,vol. 125, pp. 565- 567 ,(1999) , 10.1061/(ASCE)0733-947X(1999)125:6(565)
Jennifer S. Shane, Keith R. Molenaar, Stuart Anderson, Cliff Schexnayder, Construction Project Cost Escalation Factors Journal of Management in Engineering. ,vol. 25, pp. 221- 229 ,(2009) , 10.1061/(ASCE)0742-597X(2009)25:4(221)
Abdalla M Odeh, Hussien T Battaineh, Causes of construction delay: traditional contracts International Journal of Project Management. ,vol. 20, pp. 67- 73 ,(2002) , 10.1016/S0263-7863(00)00037-5
Keith R. Molenaar, Anthony D. Songer, Mouji Barash, PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE Journal of Management in Engineering. ,vol. 15, pp. 54- 62 ,(1999) , 10.1061/(ASCE)0742-597X(1999)15:2(54)
T.C. Berends, Cost plus incentive fee contracting - experiences and structuring International Journal of Project Management. ,vol. 18, pp. 165- 171 ,(2000) , 10.1016/S0263-7863(99)00076-9