作者: Tongdan Jin , Yu Tian , Cai Wen Zhang , David W. Coit
DOI: 10.1109/TPWRD.2012.2222936
关键词: Downtime 、 Reliability engineering 、 Engineering 、 Maintenance engineering 、 Preventive maintenance 、 Multi-objective optimization 、 Wind speed 、 Wind power 、 Cost reduction 、 Distributed generation
摘要: Power intermittency and maintenance cost are the major challenges in harvesting wind energy. This paper proposes a multicriteria optimization model to design operate wind-based distributed generation (DG) system. The goal is determine equipment sizing, siting, schedules so that system minimized while turbine reliability maximized. System comprises initial capital, operations, maintenance, downtime losses, environmental penalty. study makes an early attempt incorporate policy of generating units into planning model. moment method central limit theorem used characterize power load uncertainty. A genetic algorithm developed search nondominant solution set for intervals. proposed demonstrated on IEEE 37-node distribution network considering independent correlated speed scenarios.