Smart Manufacturing Concept in Shipbuilding Process with Related Optimization Issues and Strategies

作者:

DOI: 10.23977/MSMI.2018.82621

关键词: Manufacturing engineeringSmart manufacturingShipbuildingComputer scienceProcess (engineering)

摘要:

参考文章(36)
Bobae Kwon, Gyu M. Lee, Spatial scheduling for large assembly blocks in shipbuilding Computers & Industrial Engineering. ,vol. 89, pp. 203- 212 ,(2015) , 10.1016/J.CIE.2015.04.036
Geert Schouten, Jmj Marco Schutten, van Roelof Dijk, Ajrm Noud Gademann, Multi-project planning in shipbuilding Beta, Research School for Operations Management and Logistics. pp. 429- 444 ,(2002)
Mahesh Gupta, Hyun-Jeung Ko, Hokey Min, TOC-based performance measures and five focusing steps in a job-shop manufacturing environment International Journal of Production Research. ,vol. 40, pp. 907- 930 ,(2002) , 10.1080/00207540110097185
Le Liu, Hong Zhou, On the identical parallel-machine rescheduling with job rework disruption Computers & Industrial Engineering. ,vol. 66, pp. 186- 198 ,(2013) , 10.1016/J.CIE.2013.02.018
Myoungsoo Ham, Young Hoon Lee, Sun Hoon Kim, Real-time scheduling of multi-stage flexible job shop floor International Journal of Production Research. ,vol. 49, pp. 3715- 3730 ,(2011) , 10.1080/00207543.2010.492797
Changkyu Park, Junyong Seo, A GRASP approach to transporter scheduling and routing at a shipyard Computers & Industrial Engineering. ,vol. 63, pp. 390- 399 ,(2012) , 10.1016/J.CIE.2012.04.010
Cynthia Chen, Tommy Gärling, Ryuichi Kitamura, ACTIVITY RESCHEDULING: REASONED OR HABITUAL? Transportation Research Part F-traffic Psychology and Behaviour. ,vol. 7, pp. 351- 371 ,(2004) , 10.1016/J.TRF.2004.10.003
Rodrigo Pérez Fernández, Verónica Alonso, Virtual Reality in a shipbuilding environment Advances in Engineering Software. ,vol. 81, pp. 30- 40 ,(2015) , 10.1016/J.ADVENGSOFT.2014.11.001
Ada Che, Jianguang Feng, Haoxun Chen, Chengbin Chu, Robust optimization for the cyclic hoist scheduling problem European Journal of Operational Research. ,vol. 240, pp. 627- 636 ,(2015) , 10.1016/J.EJOR.2014.06.047
Hao Luo, Ji Fang, George Q. Huang, Real-time scheduling for hybrid flowshop in ubiquitous manufacturing environment Computers & Industrial Engineering. ,vol. 84, pp. 12- 23 ,(2015) , 10.1016/J.CIE.2014.09.019