Critical Success Factors for Project Planning and Control in Prefabrication Housing Production: A China Study

作者: Long Li , Zhongfu Li , Guangdong Wu , Xiaodan Li

DOI: 10.3390/SU10030836

关键词: Process managementProject managerCompetence (human resources)BusinessExploratory factor analysisIncentiveQuestionnaireBody of knowledgeCritical success factorProject planning

摘要: … and relationships of affecting factors, the factor analysis and … cost of precast components is jointly determined by the number of truckloads used in the delivery process and the unit cost …

参考文章(83)
Min-Koo Kim, Jack C.P. Cheng, Hoon Sohn, Chih-Chen Chang, A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning Automation in Construction. ,vol. 49, pp. 225- 238 ,(2015) , 10.1016/J.AUTCON.2014.07.010
Esin Ergen, Burcu Akinci, Rafael Sacks, Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS Automation in Construction. ,vol. 16, pp. 354- 367 ,(2007) , 10.1016/J.AUTCON.2006.07.004
Zhengdao Li, Geoffrey Qiping Shen, Xiaolong Xue, Critical review of the research on the management of prefabricated construction Habitat International. ,vol. 43, pp. 240- 249 ,(2014) , 10.1016/J.HABITATINT.2014.04.001
Peng Wu, Sui Pheng Low, Barriers to achieving green precast concrete stock management – a survey of current stock management practices in Singapore The international journal of construction management. ,vol. 14, pp. 78- 89 ,(2014) , 10.1080/15623599.2014.899126
Peng Wu, Sui Pheng Low, Xiaohua Jin, Identification of non-value adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation Resources, Conservation and Recycling. ,vol. 81, pp. 60- 70 ,(2013) , 10.1016/J.RESCONREC.2013.09.013
Low Sui Pheng, Choong Joo Chuan, Just-in-Time Management of Precast Concrete Components Journal of Construction Engineering and Management-asce. ,vol. 127, pp. 494- 501 ,(2001) , 10.1061/(ASCE)0733-9364(2001)127:6(494)
Rafael Sacks, Charles M. Eastman, Ghang Lee, Parametric 3D modeling in building construction with examples from precast concrete Automation in Construction. ,vol. 13, pp. 291- 312 ,(2004) , 10.1016/S0926-5805(03)00043-8
Albert P. C. Chan, David Scott, Ada P. L. Chan, Factors Affecting the Success of a Construction Project Journal of Construction Engineering and Management-asce. ,vol. 130, pp. 153- 155 ,(2004) , 10.1061/(ASCE)0733-9364(2004)130:1(153)
Junxiao Liu, Peter ED Love, Jim Smith, Michael Regan, Peter R Davis, None, Life Cycle Critical Success Factors for Public-Private Partnership Infrastructure Projects Journal of Management in Engineering. ,vol. 31, pp. 04014073- ,(2015) , 10.1061/(ASCE)ME.1943-5479.0000307
Faridah Ismail, Norazian Mohamad Yusuwan, Har Einur Azrin Baharuddin, Management Factors for Successful IBS Projects Implementation Procedia - Social and Behavioral Sciences. ,vol. 68, pp. 99- 107 ,(2012) , 10.1016/J.SBSPRO.2012.12.210