Impact on transmission requirements of dispersed storage and generation. Final report

作者: S. T. Lee , J. Peschon , A. Germond

DOI: 10.2172/5647265

关键词: Electric power systemReliability engineeringEnergy storageEngineeringElectric powerPower transmissionCapital costNameplate capacityTransmission (telecommunications)Electrical engineeringElectric utility

摘要: The objective of this study is to estimate the transmission and subtransmission credits dispersed power plants such as batteries fuel cells. Average credit a range for US were obtained by extrapolation based on two case studies using EPRI Synthetic Electric Utility Systems (EPRI EM-285, 1977). A conventional approach traditional utility planning criteria probabilistic which developed in Europe combined generation-transmission reliability program applied separately studies. networks are expanded first without devices then with devices. differences investments losses between expansions when properly discounted Energy limitation storage non-coincidence system local peak loads qualitatively reviewed regarding their effect credits. Study results indicate that overhead $66 $133 per kW installed capacity. In situations where underground cables could be deferred, high 250 $/kW. This compares national average capital cost $110 investment kWmore » generation addition derived from Electrical World data (September 15, 1977).« less

参考文章(0)