作者: M. B. King , O. J. Catchpole , T. R. Bott
DOI: 10.1007/978-94-011-2138-5_10
关键词: Estimation 、 Capital cost 、 Process engineering 、 Separation (aeronautics) 、 Activity-based costing 、 Process (engineering) 、 Economic evaluation 、 Computer science
摘要: Most recent papers on the economic evaluation of near-critical extraction processes have been concerned with semi-continuous for extracting materials from a solid matrix and example given in second half this chapter is separation cost process type. However, some costings carried out continuous which feed liquid (see, references [1, 2]. Although details are very different, pressures involved similar as problems costing plant evaluating energy other running costs.