作者: Bryan Chow
DOI:
关键词: Automotive engineering 、 Offset (computer science) 、 Total energy 、 Environmental science
摘要: The systems and methods disclosed herein relate to management of peak electrical demand as registered by an utility meter customer. metered level the customer may be monitored over a first portion charge measuring period, then cumulative amount energy consumed in projected total during period calculated. Next, offset determined that is required bring net lie within target value range for period. A power source such battery controlled provide second