作者: Dennis J. Haggerty
DOI:
关键词: Mechanics 、 Engineering 、 Radial surface 、 Rock core 、 High pressure 、 Wellbore 、 Geotechnical engineering 、 Pressure sensor 、 Accumulator (energy) 、 Pressure differential 、 Flow control (fluid)
摘要: A rock core flow test system comprises a first high pressure accumulator, second and fast opening control device coupled to wellbore facing end of the core. The opens when differential across exceeds predetermined threshold. accumulator is at least one pore radial surface device. further sensor between accumulator.