作者: H. A. Lazemi , M. Soleiman Dehkordi
DOI: 10.1007/S10064-017-1205-2
关键词: Post failure 、 Geology 、 Thrust 、 Drop (liquid) 、 Nature Conservation 、 Rock mass classification 、 Geotechnical engineering 、 Tunnel boring machine 、 Modulus 、 Penetration rate
摘要: One of the most important parameters to predict cost and time tunnel excavation is penetration rate boring machine (TBM). This because advance TBM highly dependent on this parameter directly related excavation. There are several methods estimate rate, including experimental, empirical analytical methods. In study, based actual collected data from Amirkabir Water Conveyance Tunnel in Iran, a new method using drop modulus equivalent thrust per cutter proposed. The defined as slope post-failure stage stress–strain curve rock mass, an operational TBM. results show that there direct relation between cutter, inverse modulus, and, finally, power equation proposed both parameters. It emphasized function