Power station installation, has heat supply device arranged in waste gas path of gas turbo-group, upstream of heat transmission equipment

作者: Althaus Dr Rolf

DOI:

关键词: Power stationHeat transferCombined cycleMechanical engineeringCombustion chamberGas compressorThermal power stationCompressor stationPetroleum engineeringEngineeringTurbine

摘要: A power plant installation has a gas turbine group (1) pressurized air store (201) and at least one storage fluid expansion machine (203) , in which the turbo compressor (101) combustion chamber (102) first (103). In waste path of group, heat supply device, particular an additional heating device (4) is arranged upstream transfer equipment. An independent claim also included for method operating station.

参考文章(6)
Bozidar Seketa, Ilja Tuschy, Ralf Gerdes, Peter Keller-Sornig, Method for cooling turbine blades/vanes ,(2002)
Peter Keller-Sornig, Ilja Tuschy, Method of operation of gas turbine having multiple burners ,(2002)
Peter Keller-Sornig, Velimir Bakran, Ilja Tuschy, Power plant and associated starting method ,(2002)