Determining the amount of marketable blocks of dimensional stone before actual extraction

作者: M. Mutlutürk

DOI: 10.1007/S10913-007-0008-4

关键词: Mathematical optimizationEngineeringQuality (business)Stone quarryMeasure (data warehouse)Extraction (military)AlgorithmMultivariate statisticalDecision variables

摘要: The lack of a proper decision variable impedes the planning dimensional stone quarry operation. So far, “quasi-grade”, which may measure quality, developed via multivariate statistical methods is offered as variable. However, marketable blocks stones should satisfy not only quality requirements, but also conform to certain standards, and these two are essentially incommensurable. Clearly, for with known amount (MDS) provides best (i.e. sequencing operation unit volumes). A method determining MDS before actual extraction presented.

参考文章(4)
F.G Bastante, J Taboada, C Ordóñez, Design and planning for slate mining using optimisation algorithms Engineering Geology. ,vol. 73, pp. 93- 103 ,(2004) , 10.1016/J.ENGGEO.2003.12.002
J. Taboada, A. Vaamonde, A. Saavedra, Evaluation of the quality of a granite quarry Engineering Geology. ,vol. 53, pp. 1- 11 ,(1999) , 10.1016/S0013-7952(98)00074-X
A.E. Tercan, Y. Özçelik, Geostatistical evaluation of dimension-stone quarries Engineering Geology. ,vol. 58, pp. 25- 33 ,(2000) , 10.1016/S0013-7952(00)00048-X
H. G. Pereira, M. G. Brito, T. Albuquerque, J. Ribeiro, Geostatistical Estimation of a Summary Recovery Index for Marble Quarries Springer, Dordrecht. pp. 1029- 1040 ,(1993) , 10.1007/978-94-011-1739-5_82