Reducing Erosional Peak Velocity of Fluid Flow Through Sand Screens

作者: Christian S. Mayer , Federico G. Gallo , Jason Y. Wang

DOI:

关键词: Fluid dynamicsOpen holeWellborePeak velocityPetroleum engineeringGeologyAnnulus (oil well)Axial symmetry

摘要: A method of reducing erosional peak velocity includes arranging a sand control screen assembly in an open hole section wellbore, the including base pipe defining plurality flow ports, arranged about pipe, and wellbore isolation device deployed within annulus defined between inner wall wellbore. fluid from surrounding subterranean formation is circulated annulus, diverted through into upon approaching device. flowing reduced with flux axially adjacent

参考文章(5)
John S. Sladic, Pavlin B. Entchev, Eric R. Grueschow, Michael T. Hecker, Tracy J. Moffett, Christian S. Mayer, Ted A. Long, Stephen McNamee, Christopher A. Hall, Michael D. Barry, Charles S. Yeh, David A. Howell, Sand control screen having improved reliability ,(2014)
Stephen Michael Greci, Jean-Marc Lopez, Scott Cunningham, Wellbore screens and methods of use thereof ,(2012)
Brandon Thomas Least, Stephen Michael Greci, Well screen assembly including an erosion resistant screen section ,(2013)