作者: John S. Sladic , Tracy J. Moffett , Stephen McNamee , Christopher A. Hall , Charles S. Yeh
DOI:
关键词: Structural engineering 、 Inflow 、 Engineering 、 Completion (oil and gas wells) 、 Well control 、 Mechanical engineering
摘要: A completion joint 100 has two sand control jackets 120A-B connected on each end of an intermediately-mounted inflow device 130. Both communicate with a housing chamber 155 through dedicated open end-rings 140A-B. The basepipe's flow openings 1 18 are isolated from this by sleeve 160 fitted ports 170. 150 is removable to allow access the 170 for pinning configure or closed given implementation.