Apparatus and Methods for Well Control

作者: John S. Sladic , Tracy J. Moffett , Stephen McNamee , Christopher A. Hall , Charles S. Yeh

DOI:

关键词: Structural engineeringInflowEngineeringCompletion (oil and gas wells)Well controlMechanical engineering

摘要: A completion joint 100 has two sand control jackets 120A-B connected on each end of an intermediately-mounted inflow device 130. Both communicate with a housing chamber 155 through dedicated open end-rings 140A-B. The basepipe's flow openings 1 18 are isolated from this by sleeve 160 fitted ports 170. 150 is removable to allow access the 170 for pinning configure or closed given implementation.

参考文章(156)