作者: Ge Weiwei
DOI:
关键词: Rack 、 Rubbing 、 Brush 、 Terminal (electronics) 、 Energy storage 、 Shell (structure) 、 Frame (networking) 、 Power (physics) 、 Mechanical engineering 、 Materials science
摘要: A manual energy storage back-rubbing instrument comprises a fixing frame (1), vertical gear rack (2), gear-box (4), (11), tensile elastic element (5), and brush (6). The is provided on (1). shell, transmission component placed inside the an input shaft output shaft. connected with terminal of component. (4) vertically moves along (11) mounted joggled (2). (5) for supplying power to make back initial position. (6) at gear-box.