作者: Oliver Sievers , Michael Scheffner , Soenke Bolln
DOI:
关键词: Signal 、 Electrical engineering 、 Output device 、 Rotor (electric) 、 Voltage 、 Engineering 、 Wind power 、 Electric potential energy 、 Operating temperature 、 Generator (circuit theory)
摘要: The invention relates to a wind energy installation having tower (10), pod which is arranged thereon and comprises rotor (12) generator (14) driven thereby, converter (15) for outputting electrical control device (16), wherein the connected network, temperature sensor heating are provided (16). According invention, an additional preheating module (4) provided, thermal switch (34, 36), monitors of at least one component operated on reaching threshold, monitoring unit (40) output (45), interacts with such that operates (23, 33) until (34) trips, (45) then transmits enable signal (50) in order start up installation. results temperature-critical components being preheated operating before starting up. startup only after phase. use UPS (18) makes it possible ensure all supplied voltage same time. This considerably improves operational reliability very low ambient temperatures, particular Arctic climates.