摘要: The paper describes practical results of four-year laboratory studies completed to estimate technically feasible conditions upgrading an existing sludge disposal system. A minimization mass and volume together with energy recovery improvement were main goals these activities. way from lab simulations full scale investments has been shown a special emphasis on application respirometric procedure being applied by authors. Proposed was authors' for estimation digestion time prediction specifi c composition. Investigations at wastewater treatment plant resulted in implementation be used during the design extension system plant. It proved that proposed changes provide close optimum process performance calculation procedures adopted team.