作者: Bogusław Bieda
DOI: 10.1007/978-3-642-28056-6_4
关键词: Life-cycle assessment 、 Engineering 、 Stochastic process 、 Process engineering 、 Quantitative analysis (finance) 、 Natural gas 、 Environmental engineering 、 Manufacturing 、 Power station 、 Production (economics) 、 Blast furnace gas
摘要: This chapter deals with the application of stochastic method, used to analyse environmental impact manufacturing processes, namely energy production in AMPSAK Power Plant. The quantitative analysis uncertainty this kind has been proposed, based on case comparative four scenarios power plant’s annual work cycle, taking into consideration that differ only change proportioning ratios two types fuels: hard coal and blast furnace gas (the remaining fuels, such as natural coke oven are left at their current levels – they start-up gas, owing higher heating value). MC methodology, because its nature, applied for (Heermann 1997). There is little mention, subject literature, research carried out area industry, let alone steel industry. In Marice et al. (2000) an effort made apply method Life Cycle Inventory (LCI) order evaluate cumulated emissions necessary materials conduct assessment of, e.g., influence produced plants.