Gas flow system

作者: Javier Alfonso Becaria Valero , Kenneth W. Lowe , Clarence Robert Dyck

DOI:

关键词: Analytical chemistryCritical ionization velocityVolumetric flow rateCasingMaterials scienceControl valvesMechanicsFlow measurementPressure measurementSeparator (oil production)Flow system

摘要: A gas flow system for removing a liquid from well bore and allowing production is provided. The comprises casing in the of gas; tubing string pressure measurement devices use determining rate influx into bore; control valve moveable between various positions ranging fully open to closed controlling through casing; tubing; total flow. switchable current phase an alternate based on determined influx, critical velocity tubing, wherein switching results either or both decrease build-up increase differs phase.

参考文章(22)
Geoff Steele, Grant George, Jordan James, Ryan Amies, Plunger lift system ,(2005)
Danny M. Casey, Well production optimizing system ,(2004)
Steve B. Coleman, Hartley B. Clay, David G. McCurdy, Lee H. Norris, A New Look at Predicting Gas-Well Load-Up Journal of Petroleum Technology. ,vol. 43, pp. 329- 333 ,(1991) , 10.2118/20280-PA
R.G. Turner, M.G. Hubbard, A.E. Dukler, Analysis and Prediction of Minimum Flow Rate for the Continuous Removal of Liquids from Gas Wells Journal of Petroleum Technology. ,vol. 21, pp. 1475- 1482 ,(1969) , 10.2118/2198-PA
Alec Martinez, John Martinez, Coiled Tubing Velocity Strings - Expanding the Cases SPE/ICoTA Coiled Tubing Roundtable. ,(1998) , 10.2118/46030-MS
Larry Keith Harms, Better Results Using Integrated Production Models for Gas Wells SPE Production Operations Symposium. ,(2005) , 10.2118/93648-MS
Robert Breidenthal, Jesse S. Rehr, Eric M. Moe, Michael G. Hartman, Method for pumping fluids ,(2002)