作者: Lester Fink , Harry Kwatny , John McDonald
关键词: Point (geometry) 、 Engineering 、 Signal generator 、 Automatic Generation Control 、 Remainder 、 Electric power system 、 Reliability engineering 、 Economic dispatch 、 Control engineering
摘要: The valve-point loading logic described in this paper is intended to meet at any time the most economical fashion a generation commitment. This objective approached by insuring that as great portion of load practicable will be carried units loaded valve points, remainder reserved for regulation, and both categories assignments made those which can provide requisite capacity lowest cost.