Final Summary Report on Target Design

作者: P. Turroni , M. Krauth , G. Guittier , J. Magimel , J.L Courouau

DOI:

关键词: DeliverableEngineering drawingSystems engineeringWork packageSystem developmentEngineering

摘要: The present document is the D13 deliverable report of work package 1, Target Development, from MEGAPIE TEST project 5th European Framework Program. Deliverable final summary on activities performed within WP 1. manufacturer (ATEA) has indicated to deliver target PSI in middle 2005. Assuming that this date realistic, it can be foreseen integral out-of beam test will conducted during end year 2005 and beginning 2006. It assumed irradiation start second quarter content 1 reflects status ancillary system development at 2004.