Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step

作者: Jan Brückner , Frank Thomas

DOI:

关键词: Separator (oil production)Waste managementCombined cycleRankine cycleSteam-electric power stationMercury vapour turbineThermal power stationHeat recovery steam generatorBoiler (power generation)Engineering

摘要: A combined cycle gas turbine plant and a corresponding method for operating such plant, in which, during load operation of the water mass flow which is supplied according to forced-flow principle waste heat steam generator adjusted that evaporator heating surface medium pressure stage oversupplied thus defined amount excess water, heated but not vaporized, discharged via water-steam separator exchanger circuit preheating fuel turbine.

参考文章(26)
Bruce W. Wilhelm, Wei D. Zhang, Jeffrey F. Magee, Vinh Q. Truong, Flow control devices and methods for a once-through horizontal evaporator ,(2013)
Paul Drouvot, Klara Berg, François Droux, Power plant with integrated fuel gas preheating ,(2014)
Erhard Liebig, Kurt Fischer, Ralf Kuske, Method and apparatus for preheating the fuel for a firing plant ,(1998)
Christoph Ruchti, Stefan Eduard Broesamle, Method for operating a combined cycle power plant ,(2012)
Rajashekhar Pendyala, Ajit Singh Sengar, Saravanan Venkataraman Nattanmai, Ammonia injection system for peaker cycle ,(2009)
Michael T. Mcmanus, Jon P. Donovan, Gerald A. Myers, Combined cycle power plant having improved cooling and method of operation thereof ,(1999)
Erich Schmid, Wilhelm Ernstberger, Hermann Bruckner, Gas and steam turbine system and operating method ,(1997)