作者: Kent Kernahan
DOI:
关键词: State (computer science) 、 Work order 、 Converters 、 Electrical engineering 、 Solar power 、 Engineering 、 Electricity generation 、 Installation
摘要: A solar panel including array converters is installed in a power generation system by first completing self-test of the an uninstalled state. Certain data obtained and compared to specifications verify proper operation. Other work order insure intended unit being installed. functional, into system, then tested again operational The includes steps for activating wherein that not activated within predetermined time period will no longer operate. may be monitored remotely, thereby allowing maintenance performed on as-needed basis.