作者: Terry J. Reed
DOI:
关键词: Synchronizing 、 Turbine 、 Power station 、 Exciter 、 Control engineering 、 Circuit breaker 、 Electric power system 、 Engineering 、 Electrical engineering 、 Synchronization (alternating current) 、 Control system
摘要: A gas turbine power plant is provided with an industrial which drives a rotating brushless exciter generator coupled to system through breaker. One or more of the turbine-generator plants are operated by hybrid digital computer control during sequenced startup, synchronizing, load and shutdown operations. The program for external analog circuitry operate in multiple loop arrangement. Automatic synchronization achieved subsystem includes programmed phase detection circuitry. An automatic divided into rough speed voltage matching, fine matching breaker closure subprograms.