作者: P. Schell , B. Godard , V. De Wilde , O. Durieux , J.-L. Lilien
DOI: 10.1049/CP.2012.0847
关键词: Distributed generation 、 Ampacity 、 Distribution system 、 Reliability engineering 、 Active Network Management 、 Technical feasibility 、 Investment strategy 、 Grid 、 Reliability (computer networking) 、 Engineering
摘要: Dynamic Line Rating (DLR), a.k.a determining the maximum rating of overhead lines based on real-time weather parameters has potential to significantly increase power transport & distribution capacity grid in favorable conditions. Combining active network management (curtailable generation) with DLR as trigger offers a solution out-there for system operator that combines technical feasibility, adequate implementation timing and economic viability. Flexible generation being already use ELIA network, benefits using it conjunction will be analyzed. This paper give first answer following questions: Q1: What is influence investment strategy? Q2: How reliability guaranteed this new much more dynamic operation approach?