作者: F.-Y. Ding , J. He
DOI: 10.1080/00207540701381291
关键词: Product (mathematics) 、 Constructive 、 Mathematical optimization 、 Engineering 、 Simulated annealing 、 Engineering drawing 、 Blocking (computing) 、 Smoothing 、 Assembly line 、 Sequence 、 Automotive industry
摘要: Mixed-model assembly nowadays is a common practice in the automobile industry. In an plant, many car options often need to be considered sequencing line, for example, multiple objectives that consider pattern, blocking, spacing, and smoothing of options. A general heuristic procedure developed this paper lines considering The obtains initial sequence by enhanced constructive procedure, swaps orders most deteriorating category objectives, performs re-sequencing attempting improve swapped sequence. was shown frequently sequences swapping when opportunities exist. further improvement step also proposed perform limited search based on solution. limited-search effective improving solutions from i...