Hydrocarbon preparation system for open hole zonal isolation and control

作者: Benn A. Voll , Morten Myhre , Martin P. Coronado

DOI:

关键词: Open holeFlow control (fluid)One stageEngineeringSequential controlAnnulus (oil well)Petroleum engineeringBorehole

摘要: A system for enhancing hydrocarbon production in long and deviated subterranean wells. Gravel is placed the annulus between screen liner borehole, together with annular isolation elements. Selective flow control achieved. Sequential or commingled achievable from multiple producing intervals of borehole. differential valve incorporated service string to allow gravel placement across screen-liner sections, separated by elements a continuous one stage operation, thereby reducing time complexity such operations.

参考文章(11)
H. Mitchell Cornette, Richard S. Vaclavik, System for isolating multiple gravel packed zones in wells ,(1994)
Nolan M. Workman, Pat M. White, Eugene E. Baker, James D. Hendrickson, Odie R. S. Davis, David D. Szarka, Method and apparatus for gravel packing multiple zones ,(1979)
Jack D. Spencer, Joseph F. Donovan, One trip multi-zone gravel packing apparatus ,(1981)
Eugene E. Baker, David D. Szarka, Isolation gravel packer ,(1985)
L. Craig Floyd, Horizontal well completion methods ,(1992)
Gene C. Craig, Pressure operated test tool ,(1980)
Lloyd G. Jones, Tommy J. Yates, Method and apparatus for gravel packing of wells ,(1993)