Impacts of uncertain project duration and asymmetric risk sensitivity information in project management

作者: Kai Yang , Ruiqing Zhao , Yanfei Lan

DOI: 10.1111/ITOR.12156

关键词: Operations researchProject management triangleBusinessProject portfolio managementRisk management planDuration (project management)Actuarial scienceProject managerSchedule (project management)Basis of estimateProject management

摘要: … The second line of this stream considers project contracting. … The third line of this stream studies project risk management. Risk … The second stream of literature related to our work is on …

参考文章(36)
George Baker, Distortion and Risk in Optimal Incentive Contracts Journal of Human Resources. ,vol. 37, pp. 728- 751 ,(2002) , 10.2307/3069615
Roger B. Myerson, INCENTIVE COMPATIBILITY AND THE BARGAINING PROBLEM Econometrica. ,vol. 47, pp. 61- 73 ,(1979) , 10.2307/1912346
Thais Cristina Sampaio Machado, Plácido Rogério Pinheiro, Isabelle Tamanini, Project management aided by verbal decision analysis approaches: a case study for the selection of the best SCRUM practices International Transactions in Operational Research. ,vol. 22, pp. 287- 312 ,(2015) , 10.1111/ITOR.12078
Robert Gibbons, Incentives Between Firms (and Within) Management Science. ,vol. 51, pp. 2- 17 ,(2005) , 10.1287/MNSC.1040.0229
Mohammad A. Ammar, Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows Journal of Construction Engineering and Management. ,vol. 137, pp. 65- 71 ,(2011) , 10.1061/(ASCE)CO.1943-7862.0000256
Olfa Dridi, Saoussen Krichen, Adel Guitouni, A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem International Transactions in Operational Research. ,vol. 21, pp. 935- 953 ,(2014) , 10.1111/ITOR.12071
Ard-Pieter de Man, Nadine Roijakkers, Alliance Governance: Balancing Control and Trust in Dealing with Risk Long Range Planning. ,vol. 42, pp. 75- 95 ,(2009) , 10.1016/J.LRP.2008.10.006
H. Dharma Kwon, Steven A. Lippman, Christopher S. Tang, Optimal time-based and cost-based coordinated project contracts with unobservable work rates International Journal of Production Economics. ,vol. 126, pp. 247- 254 ,(2010) , 10.1016/J.IJPE.2010.03.013
Michel Gagnon, Gilles d'Avignon, Belaid Aouni, Resource‐constrained project scheduling through the goal programming model: integration of the manager's preferences International Transactions in Operational Research. ,vol. 19, pp. 547- 565 ,(2012) , 10.1111/J.1475-3995.2012.00842.X