作者: Gabriel Icarte , Paulina Berrios , Raúl Castillo , Otthein Herzog
DOI: 10.1007/978-3-030-44783-0_35
关键词: Industrial engineering 、 Scheduling (production processes) 、 Process (engineering) 、 Multi-agent system 、 Production (economics) 、 Open-pit mining 、 Intelligent agent 、 Computer science 、 Heuristic 、 Truck
摘要: Material handling is an important logistic process for open-pit mines. In this process, shovels extract materials and load trucks that transport these to different destinations. To support centralized dispatching solutions have been implemented based on mathematical programming, heuristic processes or simulation modelling. Weaknesses in methods can be observed addressing the dynamics of a mine by not providing precise solution. paper, we present solution Multiagent Systems (MAS) where equipment items are represented intelligent agents interact with each other meet production goals at minimum cost. The results obtained applying MAS simulated actual data show more specific than current practical calculation time frame. addition, decreases truck costs average 18%.