作者: Zhou Minjie , Gong Jun , Yang Ming , Wang Yanling , Chen Hao
DOI:
关键词:
摘要: The automatic test system and method of the on-load performance a power distribution terminal can be used to solve technical problem that an existing waveform burr is easy generate interference on result. comprises electronic load meter, monitor, software, database multi-equipment switching device. device iscommunicated with through Ethernet. software are interacted store read data configuration. electronicload meter communicated serial port. monitor realizes disconnection access controlling off internal circuit multi-path so as realize testing ofthe multiple terminals. In invention, whether equipment accords requirement automatically determined, at same time efficiency increased.