作者: Steven R Freiburg , Thomas R Napier
DOI:
关键词:
摘要: Abstract : With the cost of construction to replace deteriorated facilities estimated in billions, Department Defense is seeking ways reducing both time and money spent provide structures high quality needed support military mission. Turnkey procurement approaches have been proposed as alternatives traditional design/bid/bid method. Two such approaches, One-Step Competitive Negotiation Two-Step Sealed Bidding, evaluated trial projects found successful when circumstances are favorable. This report provides a methodology for: (1) determining which shows potential for success using one these alternative methods and, that do, (2) implementing process, includes development design technical requirements specifications,