VISUAL COST ESTIMATING FOR EARLY PHASE PROJECT PLANNING

作者: Ward Nelson L

DOI:

关键词:

摘要: A method of visual cost estimating includes providing a graphical user interface having scaled workspace corresponding to project space, placing representation one or more items on within the workspace, adjusting layout according user's preference, predetermined rules relating items, relationship between two quantity previously placed based adding placed, and generating estimate items.

参考文章(22)
Theodore Thomas Blackmon, Construction project management system and method ,(2004)
Ron Breukelaar, Michael W. Detwiler, Hans Peter Senft, Anthony H. Watts, James W. Reynolds, Thomas Baeck, Computer-implemented land planning system and method with automated parking area design tools ,(2011)
Mary Fuzat, Bernard Barcio, David Easterby, Lawrence Ciscon, Eugene Giles, Donna Rabalais, Keith Smith, Method and system for leveraging functional knowledge using a requirement and space planning tool in an engineering project ,(2002)
Robert L. Klug, Douglas D. Lopez, Automated pricing system ,(2003)
Gregory Wayne Powell, Niall Brendan O'Kelly, Robert Bruce Wakelam, Henry C. Beck, Bradley Paul Phillips, Computer-implemented building design and modeling and project cost estimation and scheduling system ,(2004)
Andrew John Cardno, Ashok Kumar Singh, Peter Stewart Ingham, Bart Andrew Lewin, Methods, apparatus and systems for data visualization and related applications ,(2009)