A hybrid metaheuristic algorithm for a profit-oriented and energy-efficient disassembly sequencing problem

作者: Qi Lu , Yaping Ren , Hongyue Jin , Leilei Meng , Lei Li

DOI: 10.1016/J.RCIM.2019.101828

关键词:

摘要: … In terms of SP, NSGA-II performs best, the second one is HMM, … Pareto solutions as seen in the fourth row of Table 5. Further, we find that MODABC and HMM share nine same Pareto …

参考文章(42)
J.-G. Kang, D.-H. Lee, P. Xirouchakis, J.-G. Persson, Parallel disassembly sequencing with sequence-dependent operation times CIRP Annals. ,vol. 50, pp. 343- 346 ,(2001) , 10.1016/S0007-8506(07)62136-2
Hung-da Wan, Venkata Krishna Gonnuru, Disassembly planning and sequencing for end-of-life products with RFID enriched information Robotics and Computer-integrated Manufacturing. ,vol. 29, pp. 112- 118 ,(2013) , 10.1016/J.RCIM.2012.05.001
M. R. Johnson, M. H. Wang, ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE International Journal of Production Research. ,vol. 36, pp. 3227- 3252 ,(1998) , 10.1080/002075498192049
Askiner Gungor, Surendra M. Gupta, An evaluation methodology for disassembly processes annual conference on computers. ,vol. 33, pp. 329- 332 ,(1997) , 10.1016/S0360-8352(97)00104-6
Congbo Li, Ying Tang, Chengchuan Li, Lingling Li, A Modeling Approach to Analyze Variability of Remanufacturing Process Routing IEEE Transactions on Automation Science and Engineering. ,vol. 10, pp. 86- 98 ,(2013) , 10.1109/TASE.2012.2217330
Kendra E Moore, Aşkıner Güngör, Surendra M Gupta, None, Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships European Journal of Operational Research. ,vol. 135, pp. 428- 449 ,(2001) , 10.1016/S0377-2217(00)00321-0
Qian Yi, Congbo Li, Ying Tang, Xingzheng Chen, Multi-objective parameter optimization of CNC machining for low carbon manufacturing Journal of Cleaner Production. ,vol. 95, pp. 256- 264 ,(2015) , 10.1016/J.JCLEPRO.2015.02.076
ChaoYong Zhang, PeiGen Li, ZaiLin Guan, YunQing Rao, A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem Computers & Operations Research. ,vol. 34, pp. 3229- 3242 ,(2007) , 10.1016/J.COR.2005.12.002
Carlos A. Coello Coello, Nareli Cruz Cort�s, Solving Multiobjective Optimization Problems Using an Artificial Immune System Genetic Programming and Evolvable Machines. ,vol. 6, pp. 163- 190 ,(2005) , 10.1007/S10710-005-6164-X