作者: J. Lytle , N. Choi , K. Prisbrey
DOI: 10.1016/0301-7516(92)90067-7
关键词:
摘要: Abstract Enormous quantities of coal must be ground as feed to power generation facilities. The energy cost grinding is significant at 5 15 kWh/ton. If grindability could increased by preheating the with waste heat, costs reduced. objective this work was determine how affected preheating. method use population balance models interpret results before and after a heat treatment. Simulation locked cycle tests gave 40% increase in grindability. Approximately saving can expected. By using for treatment, targeted savings would maintained.