Wind turbine downtime and its importance for offshore deployment.

作者: S. Faulstich , B. Hahn , P. J. Tavner

DOI: 10.1002/WE.421

关键词:

摘要: While the performance and efficiency of wind turbines their energy yields have been improved with time, reliability still needs improvement, particularly when considering deployment offshore. IWES has gathering operational experience from since 1989, being involved in different projects dealing topic availability reliability. This paper draws statistical data Germany's ‘250 MW Wind’ programme, evaluated by IWES. The prime objective survey was to extract information about characteristics turbines. main purpose this is discuss frequency failures duration downtimes for turbine subassemblies based on existing onshore point out likely outcomes are deployed offshore.

参考文章(5)
W. Yang, P.J. Tavner, M.R. Wilkinson, Condition monitoring and fault diagnosis of a wind turbine synchronous generator drive train Iet Renewable Power Generation. ,vol. 3, pp. 1- 11 ,(2009) , 10.1049/IET-RPG:20080006
P. J. Tavner, J. Xiang, F. Spinato, Reliability analysis for wind turbines Wind Energy. ,vol. 10, pp. 1- 18 ,(2007) , 10.1002/WE.204
Peter Tavner, Clare Edwards, Andy Brinkman, Fabio Spinato, Influence of Wind Speed on Wind Turbine Reliability Wind Engineering. ,vol. 30, pp. 55- 72 ,(2006) , 10.1260/030952406777641441
E. Echavarria, B. Hahn, G. J. W. van Bussel, T. Tomiyama, Reliability of Wind Turbine Technology Through Time Journal of Solar Energy Engineering-transactions of The Asme. ,vol. 130, pp. 031005- ,(2008) , 10.1115/1.2936235
F. Spinato, P.J. Tavner, G.J.W. van Bussel, E. Koutoulakos, Reliability of wind turbine subassemblies Iet Renewable Power Generation. ,vol. 3, pp. 387- 401 ,(2009) , 10.1049/IET-RPG.2008.0060