作者: Anna Burduk , Kamil Musiał , Dagmara Górnicka , Joanna Kochańska
DOI: 10.1007/978-3-030-28957-7_24
关键词:
摘要: The paper deals with the production downtime problem. Every process may be affected by risk of occurrence unplanned breaks. It can caused various factors, for example lack components or machines failures. These result not only in disturbance flow, but also waste form downtime. Machines failures which difficult even impossible to predict. Due their random character, machine failure often results operators idleness. aim was propose solution this proposed improvement develop trainings schedule. would take a part during time repairing machine, so reduced. tool used optimal training schedule Tabu Search algorithm, meta-heuristic method supporting decision-making process.