A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime

作者: Cristiano A.V. Cavalcante , Philip A. Scarf , Adiel T. de Almeida

DOI: 10.1016/J.RESS.2010.12.004

关键词:

摘要: This paper considers an inspection policy for a single component protection or preparedness system, in which the arises from heterogeneous population. At any point time, system may be one of three states, good, defective failed. The is only required emergency, and order to ensure high availability on-demand, undergoes sequence inspections. Inspection determines state, so that if transition good state occurs between inspections it not revealed until subsequent inspection. When defect failure revealed, replaced. final We suppose either weak strong, time has distribution mixture. In these circumstances, efficacy two-phase policy, with anticipated frequency early life low later life, considered using cost criteria. investigated context valve natural gas supply network. If lifetime distributions mixture are quite distinct, then savings 5% can achieved by place simpler phase policy. Furthermore, mean small very does tend mimic burn-in

参考文章(26)
FG Badıa, María Dolores Berrade, Clemente A Campos, None, Optimal inspection and preventive maintenance of units with revealed and unrevealed failures Reliability Engineering & System Safety. ,vol. 78, pp. 157- 163 ,(2002) , 10.1016/S0951-8320(02)00154-0
X. Jia, A periodic testing model for a preparedness system with a defective state Ima Journal of Management Mathematics. ,vol. 13, pp. 39- 49 ,(2002) , 10.1093/IMAMAN/13.1.39
Rodrigo JP Ferreira, Adiel Teixeira de Almeida, Cristiano AV Cavalcante, None, A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis Reliability Engineering & System Safety. ,vol. 94, pp. 905- 912 ,(2009) , 10.1016/J.RESS.2008.10.001
Philip A. Scarf, Cristiano A.V. Cavalcante, Modelling quality in replacement and inspection maintenance International Journal of Production Economics. ,vol. 135, pp. 372- 381 ,(2012) , 10.1016/J.IJPE.2011.08.011
J.K. Vaurio, Optimization of test and maintenance intervals based on risk and cost Reliability Engineering & System Safety. ,vol. 49, pp. 23- 36 ,(1995) , 10.1016/0951-8320(95)00035-Z
R. Jiang, A. K. S. Jardine, An optimal burn‐in preventive‐replacement model associated with a mixture distribution Quality and Reliability Engineering International. ,vol. 23, pp. 83- 93 ,(2007) , 10.1002/QRE.816
J.K. Vaurio, Availability and cost functions for periodically inspected preventively maintained units Reliability Engineering & System Safety. ,vol. 63, pp. 133- 140 ,(1999) , 10.1016/S0951-8320(98)00030-1
Philip A. Scarf, Cristiano A.V. Cavalcante, Hybrid block replacement and inspection policies for a multi-component system with heterogeneous component lives European Journal of Operational Research. ,vol. 206, pp. 384- 394 ,(2010) , 10.1016/J.EJOR.2010.02.024
C.A.V. Cavalcante, A.T. de Almeida, A multi‐criteria decision‐aiding model using PROMETHEE III for preventive maintenance planning under uncertain conditions Journal of Quality in Maintenance Engineering. ,vol. 13, pp. 385- 397 ,(2007) , 10.1108/13552510710829470