作者: R. Lillestøl , S. Döbert , E. Adli , A. E. Dabrowski , I. Syratchev
DOI:
关键词:
摘要: The CLIC Test Facility 3 Beam Line is the first prototype for drive beam decelerator. Stable transport of under deceleration a mandatory component in two-beam scheme. In more than 50% total energy will be extracted from 150 MeV, 28 A electron beam, by use 16 power extraction and transfer structures. number experiments are foreseen to investigate characteristics Line, including stability, blow up efficiency extraction. General benchmarking decelerator simulation theory studies also performed. Specially designed instrumentation precision BPMs, loss monitors time-resolved spectrometer dump used experiments. This paper describes experimental program relevance results studies.