Subway Risks Assessment in Different Construction Stages using AHP and TOPSIS

作者: Arsalan Khosravizade , Mohammad Sharifipour

DOI: 10.17485/IJST/2016/V9I7/87859

关键词:

摘要: Background/Objectives: Considering the population growth need for more services, demand underground space has increased. Underground structures including tunnels have been developed mostly because of increased safety and decrease in limitations at ground level. Methods/Statistical Analysis : This research reached some results about prioritizing risks according to categorization designing, execution, finance, HSE cultural problems through determining indices contingency their impact using hierarchical AHP decision-making TOPSIS algorithms along with collecting field data form a questionnaire from experts analyzing them leading suggestions resolving them. Findings: In this we find that most critical tunneling projects, are respectively landfall risk score 0.984, unsystematic excavation 0.975, tolls 0.962, explosion 0/934, destruction or obstruction tunnel access routes 0.878, influence toxic hazardous gases 0.877, lack review during implementation 0.861 disregarding administrative details caused by high speed 0.819, which should be considered authorities order reduce control risks. Applications/Improvements: The present focused on assessment existing metro projects gathering regional information questionnaires analysis multi-criteria methods consistent nature project.

参考文章(18)
G. Emre Gürcanli, Ugur Müngen, An occupational safety risk analysis method at construction sites using fuzzy sets International Journal of Industrial Ergonomics. ,vol. 39, pp. 371- 387 ,(2009) , 10.1016/J.ERGON.2008.10.006
Osama A. Jannadi, Risks associated with trenching works in Saudi Arabia Building and Environment. ,vol. 43, pp. 776- 781 ,(2008) , 10.1016/J.BUILDENV.2007.01.034
Miguel A. Sánchez, Alberto Foyo, Carmen Tomillo, Eneko Iriarte, Geological risk assessment of the area surrounding Altamira Cave : A proposed Natural Risk Index and Safety Factor for protection of prehistoric caves Engineering Geology. ,vol. 94, pp. 180- 200 ,(2007) , 10.1016/J.ENGGEO.2007.08.004
M. F. Ng, V. M. Rao Tummala, Richard C. M. Yam, A risk‐based maintenance management model for toll road/tunnel operations Construction Management and Economics. ,vol. 21, pp. 495- 510 ,(2003) , 10.1080/0144619032000089616
M. Son, E.J. Cording, Tunneling, building response, and damage estimation Tunnelling and Underground Space Technology. ,vol. 21, pp. 326- ,(2006) , 10.1016/J.TUST.2005.12.040
T. Isaksson, H. Stille, Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation Rock Mechanics and Rock Engineering. ,vol. 38, pp. 373- 398 ,(2005) , 10.1007/S00603-005-0048-5
Seyedreza Siadati, Vahid Shahhosseini, Comparison of Modern Structural Systems based on a Fuzzy Analytical Hierarchy Process Indian journal of science and technology. ,vol. 8, ,(2015) , 10.17485/IJST/2015/V8I13/58909
Vivian W. Y Tam, Saixing Zeng, Chun M Tam, Integrating Safety, Environmental and Quality Risks for Project Management Using a FMEA Method Inzinerine Ekonomika-engineering Economics. ,vol. 66, pp. 44- 52 ,(2010) , 10.5755/J01.EE.66.1.11645
Guía de los, A Guide to the project management body of knowledge PMI Publications. ,(2017)