Sizing equipment for open pit mining - a review of critical parameters

作者: E. Bozorgebrahimi , R. A. Hall , G. H. Blackwell

DOI: 10.1179/037178403225003591

关键词:

摘要: AbstractOver the past century, open pit mines have steadily increased their production rate. Larger equipment and new technologies make it possible to mine larger batches of materials in a shorter time. Low commodity prices forced companies decrease unit cost, by using improving productivity. In late 20th with facing low competing strong rivals globally, lower costs ensured survival. As result, geometry mining dramatically size. To date, terms productivity, industry continues adhere 'bigger is better' mentality. There are indications that this strategy may not always be advantageous. This paper will discuss on-going research into understanding effects size on surface mining. The includes investigation mill construction operating costs, design, economic optimisati...

参考文章(2)
W. SCOTT DUNBAR, SEAN DESSUREAULT, MALCOLM SCOBLE, ANALYSIS OF FLEXIBLE MINING SYSTEMS Mineral Resources Engineering. ,vol. 08, pp. 165- 179 ,(1999) , 10.1142/S0950609899000190
G. H. Blackwell, Estimation of large open pit haulage truck requirements Cim Bulletin. ,vol. 92, pp. 143- 149 ,(1999)