Using simulation to schedule manufacturing resources

作者: Hank Czarnecki , Bernard J Schroer , M Mizzanur Rahman , None

DOI: 10.1145/268437.268619

关键词:

摘要: This paper discusses a real-world application of simulation to schedule operator and machine resources in floor tile manufacturing plant. The attempts at using spread sheet, simulator, finally ProModel the scheduling process.

参考文章(5)
Michael C. Cheselka, Mark A. Flower, The AMP-AKZO company's simulation-based finite capacity scheduling system winter simulation conference. pp. 1013- 1019 ,(1994) , 10.5555/193201.194649
Michael B. Thompson, Simulation-based capacity planning and scheduling with AutoSched winter simulation conference. pp. 255- 262 ,(1993) , 10.1145/256563.256643
Anand S. Kunnathur, Sriram Sampath, P. S. Sundararagharan, Dynamic rescheduling of a job shop: a simulation study winter simulation conference. pp. 1091- 1098 ,(1996) , 10.1145/256562.256915
Bernard J. Schroer, Phillip A. Farrington, James J. Swain, Dawn R. Utley, A generic simulator for modeling manufacturing modules winter simulation conference. pp. 1155- 1160 ,(1996) , 10.1145/256562.256926
Glenn R. Drake, Jeffrey S. Smith, Simulation system for real-time planning, scheduling, and control winter simulation conference. pp. 1083- 1090 ,(1996) , 10.1145/256562.256914