作者: Boris N. Abramovich , Kirill V. Babyr , Denis N. Pelenev , Aleksey I. Zimovets
DOI: 10.1109/ELCONRUS51938.2021.9396493
关键词:
摘要: The article presents the results of a comparative analysis accuracy existing methods for determining capacitive current relative to ground 6 kV distribution network mining enterprise. calculation currents flowing in outgoing connections electric single-phase fault mode is performed using various methods. An experiment an active was conducted, based on which obtained values made it possible determine errors known