Evaluation of success probability in multiple seam room-and-pillar mining

作者: E.C.K. Chanda

DOI: 10.1016/S0167-9031(89)90767-6

关键词:

摘要: Abstract A complete evaluation of multiple seam mining potential for any coal property requires the analysis historical data and controlling conditions. The major problem affecting is interaction between workings in contiguous seams. success or failure scam can be evaluated using statistical techniques. computer-based stepwise regression algorithm used to develop an equation predicting probability two seam-mining situations. model provides a measure risk involved are from record attempted Eastern United States. variables significantly influencing percent sandstone interburden, ratio interburden thickness lower thickness, time delay, both seams, depth cover upper seam, columnated pillars, entries leading seam. developed was found quite satisfactory as predictor within range which it developed.

参考文章(3)
Matthew Spedding, Multiple Seam Mining The 17th U.S. Symposium on Rock Mechanics (USRMS). ,(1976)
John W. Wilson, S. Nakajima, B. D. Singh, Design Considerations For Mining Thick Seams And Seams Lying In Close Proximity To One Another The 17th U.S. Symposium on Rock Mechanics (USRMS). ,(1976)
D.W. Gentry, F.S. Kendorski, J.F. Abel, Tunnel advance rate prediction based on geologic and engineering observations International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. ,vol. 8, pp. 451- 475 ,(1971) , 10.1016/1365-1609(71)90012-8