作者: Timo Schudeleit , Simon Züst , Konrad Wegener
DOI: 10.1007/S00170-016-9659-0
关键词:
摘要: Energy efficiency in industries is one of the dominating challenges twenty-first century. Since release first eco-design directive 2005/32/EC 2005, great research effort has been spent on energy assessment for using products. A missing piece finalizing ISO 14955-2 quantification a machine tool’s non-electric power demand due to external support systems such as compressed air systems, water cooling conditioning and exhaust systems. These are comprised technical building service cause additional electrical that can be assigned tool. model set up links tool services. The enables deduce caused by equivalents. Hence, total factory-integrated derived. applicability equivalents proven practical case study grinding machine.