A cost-based optimization of a fiberboard pressing plant using Monte-Carlo simulation (a reliability program)

作者: Monardo Giani

DOI:

关键词:

摘要: In this research the reliability and availability of fiberboard pressing plant is assessed a cost-based optimization system using Monte- Carlo simulation method performed. The woodchip pulp or engineered wood industry in Australia around world lucrative industry. One such hardboard. main system, as it converts wet to fiberboard. assessment identified has highest downtime throughout plus represents bottleneck process. A survey late nineties revealed there are over one thousand plants world, with being common among these plants. No work been done assess estimate system; therefore can be used for assessing any type.

参考文章(120)
W.M.J. Geraerds, The cost of downtime for maintenance : preliminary considerations EUT - BDK report. Dept. of Industrial Engineering and Management Science. ,vol. 11, ,(1984)
Roy Billinton, Ronald N. Allan, Reliability Evaluation of Engineering Systems ,(1983)
Imad Alsyouf, Cost Effective Maintenance for Competitve Advantages Växjö University Press. ,(2004)
Cathy Hunsley, John Davidson, The Reliability of Mechanical Systems ,(1988)
John Moubray, Reliability-centred maintenance Fuel and Energy Abstracts. ,vol. 4, pp. 304- ,(1995)
Bryan Dodson, The Weibull Analysis Handbook ,(1994)