作者: Monardo Giani
DOI:
关键词:
摘要: In this research the reliability and availability of fiberboard pressing plant is assessed a cost-based optimization system using Monte- Carlo simulation method performed. The woodchip pulp or engineered wood industry in Australia around world lucrative industry. One such hardboard. main system, as it converts wet to fiberboard. assessment identified has highest downtime throughout plus represents bottleneck process. A survey late nineties revealed there are over one thousand plants world, with being common among these plants. No work been done assess estimate system; therefore can be used for assessing any type.