A Pareto firefly algorithm for multi-objective disassembly line balancing problems with hazard evaluation

作者: Lixia Zhu , Zeqiang Zhang , Yi Wang

DOI: 10.1080/00207543.2018.1471238

关键词:

摘要: The safety hazards existing in the process of disassembling waste products pose potential harms to the physical and mental health of the workers. In this article, these hazards involved in the disassembly operations are evaluated and taken into consideration in a disassembly line balancing problem. A multi-objective mathematical model is constructed to minimise the number of workstations, maximise the smoothing rate and minimise the average maximum hazard involved in the disassembly line. Subsequently, a Pareto firefly …

参考文章(53)
Mingfu Li, Yuyan Zhang, Bing Zeng, Houming Zhou, Jingang Liu, The modified firefly algorithm considering fireflies’visual range and its application in assembly sequences planning The International Journal of Advanced Manufacturing Technology. ,vol. 82, pp. 1381- 1403 ,(2016) , 10.1007/S00170-015-7457-8
J. Kwiecień, B. Filipowicz, Firefly algorithm in optimization of queueing systems Bulletin of The Polish Academy of Sciences-technical Sciences. ,vol. 60, pp. 363- 368 ,(2012) , 10.2478/V10175-012-0049-Y
Yaping Ren, Guangdong Tian, MengChu Zhou, Scheduling of rescue vehicles to forest fires via multi-objective Particle Swarm Optimization international conference on advanced mechatronic systems. pp. 79- 85 ,(2015) , 10.1109/ICAMECHS.2015.7287133
S. Karthikeyan, P. Asokan, S. Nickolas, A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints The International Journal of Advanced Manufacturing Technology. ,vol. 72, pp. 1567- 1579 ,(2014) , 10.1007/S00170-014-5753-3
Surendra M. Gupta, Evren Erbis, Seamus M. McGovern, Disassembly sequencing problem: a case study of a cell phone Environmental conscious manufacturing. Conferenced. ,vol. 5583, pp. 43- 52 ,(2004) , 10.1117/12.577196
Xingquan Zuo, Cheng Chen, Wei Tan, Mengchu Zhou, Vehicle Scheduling of an Urban Bus Line via an Improved Multiobjective Genetic Algorithm IEEE Transactions on Intelligent Transportation Systems. ,vol. 16, pp. 1030- 1041 ,(2015) , 10.1109/TITS.2014.2352599
N. Poursalehi, A. Zolfaghari, A. Minuchehr, Multi-objective loading pattern enhancement of PWR based on the Discrete Firefly Algorithm Annals of Nuclear Energy. ,vol. 57, pp. 151- 163 ,(2013) , 10.1016/J.ANUCENE.2013.01.043
Mohand Lounes Bentaha, Olga Battaïa, Alexandre Dolgui, An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times International Journal of Production Research. ,vol. 53, pp. 1807- 1818 ,(2015) , 10.1080/00207543.2014.961212
Can B. Kalayci, Surendra M. Gupta, Ant colony optimization for sequence‐dependent disassembly line balancing problem Journal of Manufacturing Technology Management. ,vol. 24, pp. 413- 427 ,(2013) , 10.1108/17410381311318909
Li-Ping Ding, Yi-Xiong Feng, Jian-Rong Tan, Yi-Cong Gao, A new multi-objective ant colony algorithm for solving the disassembly line balancing problem The International Journal of Advanced Manufacturing Technology. ,vol. 48, pp. 761- 771 ,(2010) , 10.1007/S00170-009-2303-5