Cyclic Productivity for Horizontal Directional Drilling (HDD) Operation

作者: Mohmd Sarireh

DOI:

关键词:

摘要: Horizontal directional drilling (HDD) is considered as the most applicable and cost effective technology among trenchless technologies known. HDD can be applied in different soil conditions, for deep laying of pipeline diameter long drives. From 12 units manufactured 1984, about 32,135 were sold 2011. Studying productivity first goal this case study. Using cyclic nature operation, determined by applying MicroCYCLONE simulation. Also, operational project estimated. Through current research, presenting resources another that was achieved terms human mechanical resources.

参考文章(11)
Daniel W. Halpin, Leland S. Riggs, Planning and analysis of construction operations ,(1992)
Erez N. Allouche, Samuel T. Ariaratnam, Jason S. Lueke, Horizontal directional drilling: profile of an emerging industry Journal of Construction Engineering and Management-asce. ,vol. 126, pp. 68- 76 ,(2000) , 10.1061/(ASCE)0733-9364(2000)126:1(68)
Simaan AbouRizk, Role of Simulation in Construction Engineering and Management Journal of Construction Engineering and Management-asce. ,vol. 136, pp. 1140- 1153 ,(2010) , 10.1061/(ASCE)CO.1943-7862.0000220
Antonio A. Gonzalez‐Quevedo, Simaan M. AbouRizk, David T. Iseley, Daniel W. Halpin, Comparison of Two Simulation Methodologies in Construction Journal of Construction Engineering and Management-asce. ,vol. 119, pp. 573- 589 ,(1993) , 10.1061/(ASCE)0733-9364(1993)119:3(573)
Erez N. Allouche, Samuel T. Ariaratnam, Simon M. AbouRizk, Applications of Horizontal Characterization Techniques in Trenchless Construction Journal of Construction Engineering and Management-asce. ,vol. 127, pp. 476- 484 ,(2001) , 10.1061/(ASCE)0733-9364(2001)127:6(476)
Hyeon-Shik Baik, Dulcy M. Abraham, Sanjiv Gokhale, A decision support system for horizontal directional drilling Tunnelling and Underground Space Technology. ,vol. 18, pp. 99- 109 ,(2003) , 10.1016/S0886-7798(03)00002-6
E. N. Allouche, S. T. Ariaratnam, C. W. MacLeod, Software for Planning and Cost Control in Directional Drilling Projects Journal of Construction Engineering and Management-asce. ,vol. 129, pp. 446- 453 ,(2003) , 10.1061/(ASCE)0733-9364(2003)129:4(446)
Roy Yu Luo, Mohammad Najafi, Productivity Study of Microtunneling Pipe Installation Using Simulation Journal of Infrastructure Systems. ,vol. 13, pp. 247- 260 ,(2007) , 10.1061/(ASCE)1076-0342(2007)13:3(247)
Hong Pang, Amin Hammad, Cheng Zhang, Sensitivity analysis of construction simulation using Cell-DEVS and microcyclone winter simulation conference. pp. 2021- 2028 ,(2006) , 10.5555/1218112.1218481