作者: P. Gebraad , A. Ning , K. Dykes , P. Fleming
DOI:
关键词:
摘要: This presentation was given at the third Wind Energy Systems Engineering Workshop in Boulder, Colorado, and focused on wind plant controls research, combined optimization, a case study Princess Amalia Park, results from study, future work.