Assessment of Carbon Footprint and Economic Evaluation Schedule of Agriculture Workland by Theoretical Queuing

作者: Adib Guardiola Mouhaffel , Carlos Martínez Dominguez , Ricardo Díaz Martín , Assane Seck , Wagué Ahmadou

DOI: 10.17485/IJST/2017/V10I19/110572

关键词:

摘要: Objectives: To study the carbon footprints in agricultural work and to find ways improve performance process order minimise greenhouse emissions environment management. Methods/Statistical Analysis: In first part, a methodology is developed by which an optimal ratio between size of shovels trucks determined. The second part gives fundamentals queuing theory its application analysing shovel trucks. Using above theory, truck fleet actual conditions can be estimated. Minimal operating cost working system (shovels trucks) represents basic requirement analysed process. was validated on Caterpillar front-shovel - combinations. This paper shares lessons learned from creating simulation model implementing it visual framework. Findings: Addition equipments/modern tools works increases systems so footprint; using two independent variables analyzed final score determinate relationship delay reduction emissions. Mainly data use emissions, one equipment numbers Bucket Shovel size. Increasing machine permit gain 300% time bucket 1.25 m3, this increase associated with 30% over cost. Comparison other 2.40 m3 already 180% less 67% more economic. Definitely economic emission, loader m 3 53.47% than fast composed loaders 1.25. bigger shelf capacity better choice increasing number equipments. Application/Improvements: Evaluation where resources saved reduced proportionately reduce Trace agriculture Africa has important consequence global environmental

参考文章(15)
Daniel W. Halpin, CONSTRUCTO — An Interactive Gaming Environment Journal of the Construction Division. ,vol. 102, pp. 145- 196 ,(1976) , 10.1061/JCCEAZ.0000582
Boyd C. Paulson, Interactive Graphics for Simulating Construction Operations Journal of the Construction Division. ,vol. 104, pp. 69- 76 ,(1978) , 10.1061/JCCEAZ.0000758
Dario Bonino, Fulvio Corno, Rule-based intelligence for domotic environments Automation in Construction. ,vol. 19, pp. 183- 196 ,(2010) , 10.1016/J.AUTCON.2009.10.008
Daniel W. Halpin, Luis-Henrique Martinez, Real world applications of construction process simulation winter simulation conference. ,vol. 2, pp. 956- 962 ,(1999) , 10.1145/324898.324947
Min-Yuan Cheng, Hsing-Chih Tsai, Yun-Yan Lai, Construction management process reengineering performance measurements Automation in Construction. ,vol. 18, pp. 183- 193 ,(2009) , 10.1016/J.AUTCON.2008.07.005
Tung Au, Richard L. Bostleman, Ernest W. Parti, Construction Management Game - Deterministic Model Journal of the Construction Division. ,vol. 95, pp. 25- 38 ,(1969) , 10.1061/JCCEAZ.0000257
Kenneth David Strang, Importance of verifying queue model assumptions before planning with simulation software European Journal of Operational Research. ,vol. 218, pp. 493- 504 ,(2012) , 10.1016/J.EJOR.2011.10.054
C. Dennis Pegden, Deborah A. Davis, Arena: a SIMAN/Cinema-based hierarchical modeling system winter simulation conference. pp. 390- 399 ,(1992) , 10.1145/167293.167390