摘要: A solution technique is formulated and provided for the electricity procurement problem faced by a large consumer. The objective of this consumer to minimise cost while limiting risk fluctuation due pool price volatility. Electricity sources include pool, bilateral contracts self-production. Uncertainty related prices. realistic case study analysed results presented. Conclusions are duly drawn.